Select a three-phase double-pump controller against both motor requirements and the intended water-system sequence. Confirm the supported modes, inputs and fault responses before comparing prices or advertised features. Two pump connections alone do not establish suitability for every duty/standby or simultaneous-running arrangement.

Updated 20 October 2026

Prepare the double-pump brief

Use the same requirement for each proposed model
AreaInformation to provide or confirm
Motor 1 and motor 2Separate complete nameplate records and starting requirements.
Supply and ratingsRequired electrical arrangement and what each quoted rating applies to.
Water dutyFilling, emptying, pressure-related or other supported operation.
Operating modeRequired master/standby, rotation, dual-start or other confirmed sequence.
InputsSuitable demand, normal stop and interlock devices.
Abnormal responseRequired indication and behaviour when one pump is unavailable.
Installation and supportEnvironment, documents, commissioning and supported service.

Do not combine the motor data into one assumption

Confirm voltage, phase, frequency, current, power and required starting equipment for each motor. Ask whether the proposed configuration supports the actual pair and how its ratings are applied. Where motors differ, obtain a documented answer rather than assuming identical settings.

A digital display does not establish variable-speed capability, and an automatic panel may not supply every motor-specific starting component. Identify those requirements separately.

Describe when each pump should operate

Write the normal sequence and the condition that requests additional or alternate pumping. The available Winning Double Pump Manual lists several working modes, but their documented behaviour and configuration must match the chosen product.

See the operating-mode guide. Do not use a mode name as a substitute for a complete start/stop and recovery description.

Specify sensing and reporting

Confirm the input types and their electrical requirements. A float, probe and transmitter are not automatically interchangeable. Normal stop, source permission and abnormal-level alarm also have different roles.

Remote monitoring, communication protocols and fault history must be checked as specific functions. State who should receive information and what response is needed rather than assuming every controller supplies a complete supervisory system.

Compare the whole installation

Include required sensors, external motor equipment, interface work, mounting, installation and commissioning. Retain actual warranty terms and parts/support information. A lower unit price may not cover the same arrangement.

Use the model comparison sheet and leave unconfirmed features unresolved until documentation is supplied.

Agree acceptance before ordering

Have qualified personnel verify normal demand, stop, relevant interlocks and supported two-pump behaviour using approved methods. Do not create unsafe conditions or bypass protection to demonstrate a function.

Retain both motor records, the chosen mode, settings and commissioning result with the matching manual. Electrical work and internal tests require the actual diagrams and proper isolation. Use the automatic-operation guide if the observed sequence later differs from the documented one.

Building F183, No.2, Lane 158, Gangye Road, Xiaokunshan Town, Songjiang District, Shanghai
Leave a Message
Send Us A Message

Quick Links

Copyright  ©  Shanghai Winning Electric Co., Ltd. Sitemap |  沪ICP备17056656号-2